Boxer

Guide rail Boxer 12 mm * With an overall height of 12 mm and lever

Guide rail Boxer 12 mm
  • Very small dimensions of only 12 mm height and 20 mm width
  • With screwed slide block
Contact us

With an overall height of 12 mm and lever

Application Areas

  • Single leaf doors
  • Integrated installation
  • Installation situations with little installation space
  • Right and left single-action doors

Technical data

Guide rail Boxer 12 mm
Length 440 mm
Width 20 mm
Height 12 mm
opening restrictor upgradable Yes
Hold-open function Optional

Variants & Accessories

Contact

GEZE Central +31-40-262-90-80 GEZE Service +31-40-262-90-46