Boxer 1-leaf

Boxer * Integrated door closer for single leaf doors with a leaf width of up to 1400 mm

GEZE Boxer integrated door closer Integrated door closer for single leaf doors with a leaf width of up to 1400 mm. The door closer is embedded in the door leaf and the frame and meets the highest design demands. Hydraulic latching action which accelerates the door shortly before reaching the closed position.
  • Closing force with variable adjustment of EN 2-4 or EN 3-6
  • Can be used for right and left hand doors without conversion
  • Door closer is embedded in the door leaf and frame and fulfils the highest design demands
  • Integrated back check, slows down doors that are thrown open forcefully
  • Hydraulic latching action which accelerates the door shortly before it is closed
  • Closing speed can be individually adjusted
Show more
  • All functions can be adjusted in the installed state
Contact us

Application Areas

  • Fire and smoke protection doors, proof of suitability for the door required
  • Right and left single-action doors
  • Single-action doors up to 1400 mm leaf width, for door weight up to 180 kg
  • For door leaf thicknesses from 40 mm
  • Integrated installation

Technical data

Boxer
Closing force in accordance with EN 1154 EN 2 - 6
Barrier-free in accordance with DIN 18040 up to leaf width (max.) in mm 1100 mm
Leaf width (max.) 1400 mm
Leaf weight (max.) 180 kg
Type of installation Concealed
Opening angle (max.) 120 °
Suitability for fire protection doors Yes
Closing force adjustable Yes, stepless
Adjustable closing speed Yes
Latching action adjustable Yes, via valve
Back check integrated Yes, hydraulically adjustable
Position of closing force adjustment Top
Hold-open function Optional

Downloads

Contact

GEZE Central +31-40-262-90-80 GEZE Service +31-40-262-90-46